alternate image facebook
 
ATTERT : CORETEC présente la chaufferie à copeaux et son réseau de chaleur
As part of the "Power Village" of the "Park Festival" which took place in Attert on 3rd July, Gregary TACK - Project Engineer- had the opportunity to ...

Browse News

2011/07/04
ATTERT : CORETEC présente la chaufferie à copeaux et son réseau de chaleur

As part of the "Power Village" of the "Park Festival" which took place in Attert on 3rd July, Gregary TACK - Project Engineer- had the opportunity to explain to the citizens the running principle of the wood chip boiler and its heat network connected to 3 sub-stations. The boiler, with a capacity of 220 kW, supplies a heating network linking various municipla buildings : the city house, the visitor center, the central archive, the CPAS and the police building.

2010/12/24
Provisional acceptance of the CHP unit at GALACTIC

22/12/10, Galactic granted the provisional acceptance of the natural gaz CHP unit installed by Coretec on their site. This 2002 kWél installation, studied and carried out by Coretec Engineering, allows an economy of more or less 3000 tons of CO2/year.

2010/12/22
CORETEC - Fast50 growth in a "classical" sector

Fast50Magazine consacre en cette fin d'année un article à Coretec.

Lien vers l'article :Deloitte-Fast-50-2010-article.pdf

2010/12/01
Provisionnal acceptance at Red Cross in Uccles

This 01/12/2010, the Red Cross signed the provisionnal acceptance concerning the conception of the ventilation, boiler room and regulation from their office building located in Uccles.

 

2010/11/30
Heating networks : more flexible and more rapids to implemented that you could imagine

In its edition of the 4th quarter 2010, ENERGYMAG devoted an article to the small heating networks and more particularly to the last installation carried out by CORETEC for the account of the ASBL Jeunes Invest' Bartholomé, on the site of Clos du Chemin Vert in Chimay.

Energymag-4eme-trimestres-2010.pdf

 

Page: 1 2 3 4 5 6 7