22/12/10, Galactic granted the provisional acceptance of the natural gaz CHP unit installed by Coretec on their site. This 2002 kWél installation, studied and carried out by Coretec Engineering, allows an economy of more or less 3000 tons of CO2/year.![]()
Fast50Magazine consacre en cette fin d'année un article à Coretec.
Lien vers l'article : Deloitte-Fast-50-2010-article.pdf

In its edition of the 4th quarter 2010, ENERGYMAG devoted an article to the small heating networks and more particularly to the last installation carried out by CORETEC for the account of the ASBL Jeunes Invest' Bartholomé, on the site of Clos du Chemin Vert in Chimay.
Energymag-4eme-trimestres-2010.pdf
- heating of the buildings of the Derwa Firm
- heating of the cleaning water
- preparation of the domestic hot water of the Slaughter-houses of Liege
Moreover, the electricity is used by Derwa.
This November 16, Mr Thierry Carrette, administrator of CORETEC, will present, during the session dedicated to the innovating applications in heat recovery, a case study having for topic the recovery of waste heat in a slaughter-house of pigs with a rate of recovery of 86%.
For more details, to see our news of October 15, 2008.


